Stage 3 Photo Capture

14 shots · 13 mandatory · Fixture mode (Pilot Case #001)

Photos are checked on your device. In this phase they are not uploaded or stored.

0 of 13 mandatory slots done0%

Verified or inaccessible counts as done. 90% of mandatory slots unlocks the AI audit.

Exterior Perimeter

  • MandatorySingle shotPending

    External PVC stormwater risers & slab edge

    Walk the slab perimeter and capture PVC stormwater risers clearly showing whether protective caps or tape are fitted.

    Plan ref: Drainage Plan & Site Housekeeping

Roof / Ceiling Cavity

  • MandatoryWidePending

    Truss bottom-chord runners & diagonal Speedbrace (Wide)

    Stand in the main living area and tilt your phone 45 degrees upward to capture the full span of roof trusses and bottom-chord runners.

    Plan ref: AS 4440 / Truss Layout Sheets 2-3

  • MandatoryClose-UpPending

    Truss tie-down straps / Multigrips to top plate (Close-Up)

    Zoom or step close to an external top plate truss connection so individual nails in the steel strapbrace or Multigrip are clearly readable.

    Plan ref: AS 1684.2 Wind Tie-Downs

Exterior Eaves

  • MandatoryClose-UpPending

    Metal fascia bracket screw count (Close-Up)

    Aim upward at a typical metal fascia bracket where it meets the truss tail so all 3 fixing screws are countable.

    Plan ref: Roof & Eave Fixings Spec

Internal Hallways & Bedrooms

  • MandatorySingle shotPending

    Internal doorway heads & central jack studs

    Frame a typical internal doorway from top of door head to top plate so any central jack/cripple stud above the opening is clearly visible.

    Plan ref: AS/NZS 2589 Drywall Crack Prevention

Double Garage

  • MandatoryWidePending

    Garage LVL pitching beam full span (Wide)

    Stand inside the garage facing the main door opening so the entire LVL beam and both end supports fit in frame.

    Plan ref: Pickard Sheet 1 — 5410 mm Opening PB 360x63 LVL

  • MandatoryClose-UpPending

    Solid packing under truss nodes above LVL (Close-Up)

    Aim up at the gap between the LVL beam and top plate so we can verify continuous solid blocking under every truss bearing point.

    Plan ref: Pickard Sheet 1 — 5410 mm Opening PB 360x63 LVL

Internal Hallway

  • MandatoryWidePending

    Large opening jamb studs & lintel (Internal Hallway)

    Stand 2-3 m back so the full height of both left and right jamb stud packs and the overhead lintel are visible without glare.

    Plan ref: Pickard Sheet 1 — 12,550 mm Truss Jamb Stud Load Path

  • MandatoryClose-UpPending

    Jamb stud integrity check — zero notches (Internal Hallway)

    Step within 1 m of the jamb stud pack to confirm no plumber or electrician has notched or drilled the load-bearing studs.

    Plan ref: Pickard Sheet 1 — 12,550 mm Truss Jamb Stud Load Path

Southern Elevation South Wall

  • MandatoryWidePending

    Wall bracing panel & bottom plate (Southern Elevation South Wall)

    Capture the full bracing sheet or steel cross-brace from top plate down to the concrete slab.

    Plan ref: Pickard Sheet 3 — N2 Wind Bracing & Slab Anchors

  • MandatoryClose-UpPending

    Slab anchor bolts on bracing bottom plate (Southern Elevation South Wall)

    Crouch low and photograph the concrete screw-bolts or masonry anchors securing the bottom plate to the slab.

    Plan ref: Pickard Sheet 3 — N2 Wind Bracing & Slab Anchors

Main Bathroom & WC

  • MandatorySingle shotPending

    NCC 2022 grab-rail blocking noggings (Main Bathroom & WC)

    Capture the full shower and WC side walls between waist and chest height (700-1000 mm above slab) so horizontal timber noggings are clearly visible.

    Plan ref: NCC 2022 Livable Housing Clause 6.2 (700-1000 mm AFL)

Kitchen (Window SW 1221)

  • MandatorySingle shotPending

    Verify paid quote item: 3x Electrical Feeds in Wall Cavity (DWP, MW, GPO)

    Photograph the Kitchen (Window SW 1221) area clearly showing "3x Electrical Feeds in Wall Cavity (DWP, MW, GPO)" has been framed or roughed-in before linings close the wall.

    Plan ref: Quote p.3 / Sheet 06

Ensuite Shower

  • OptionalSingle shotPending

    Verify selection: Tiled Shelf Recess 90 D @ 1150 AFL

    Take a clear close-up of "Tiled Shelf Recess 90 D @ 1150 AFL" in Ensuite Shower (include compliance sticker or recess framing where applicable).

    Plan ref: Quote p.4 / Sheet 07

13 mandatory slot(s) still need a photo or an inaccessible reason.